Windsor Environmental
Manhattan buildings

Asbestos removal and testing in Manhattan

Co-op and condo renovations, prewar and postwar buildings, offices and storefronts from the Battery to Inwood. We handle the testing, the abatement, the filings and the paperwork your managing agent asks for.

  • Licensed in New York & New Jersey
  • NYC DEP-certified investigators
  • EPA-certified lead professionals
  • Fully insured, COIs on request
  • Free in-person estimates

Most Manhattan asbestos work starts with a renovation. You want to redo a kitchen, take up old parquet or open a wall, and the building, the architect or the Department of Buildings wants to know what’s in the materials first. That means an asbestos inspection, and if anything is found, licensed removal before the contractor can start.

We do both, and we know how Manhattan buildings run: the alteration agreement, the managing agent, the work hours, the freight elevator and the neighbors on the other side of the wall.

Herringbone parquet floor in a Manhattan apartment

Why Manhattan jobs are different

  • Board and managing agent approval. Most co-ops and condos want the asbestos scope, our insurance certificate and a schedule before work starts. We send the managing agent what they ask for, in the format they ask for it.
  • COIs that name the right parties. Certificates of insurance naming the building, the board and the managing agent, issued fast so your start date doesn’t slip.
  • Building work hours. We work to your building’s hours and book the freight elevator and service entrance in advance.
  • Permits that need paperwork. A DOB alteration permit needs an asbestos investigation (ACP-5) first. When removal is more than a minor amount, it’s an asbestos project with its own filing and notices, and we handle that too.
  • Neighbors close by. Sealed containment, negative air and independent air monitoring keep the work inside your apartment, and clearance testing confirms it before the rebuild starts.

What we find in Manhattan buildings

The age of the building tells us a lot about what to test.

  • Prewar co-ops and walk-ups. Black mastic under parquet and herringbone floors, pipe and riser insulation, boiler room insulation, and plaster or joint compound that can contain asbestos. Lead paint is common under newer layers.
  • Postwar apartment buildings (1945–1980). 9x9 vinyl floor tiles and their mastic, sheetrock joint compound, window caulking, and insulation in mechanical spaces.
  • Office and commercial floors. Floor tile and mastic under carpet, ceiling tiles, and fireproofing in some towers, often found during a tenant fit-out.

Not every old material contains asbestos. Testing tells you exactly what needs removal, so you don’t pay to remove what doesn’t.

Neighborhoods we work in

All of Manhattan, including the Upper East Side, Upper West Side, Midtown, Murray Hill, Kips Bay, Gramercy, Chelsea, Hell’s Kitchen, Greenwich Village, the West Village, SoHo, Tribeca, the Financial District, Battery Park City, the Lower East Side, the East Village, Harlem, Morningside Heights, Washington Heights, Inwood and Roosevelt Island.

Free in-person estimates

Many jobs can be quoted from photos and a report. When a job needs to be seen, we come out and estimate it for free.

Every size of job

Small jobsA pipe elbow, one bathroom floor, a single test. No job is too small.
Apartments & homesKitchens, gut renovations, basements, whole houses.
Buildings & roofsFull roofs, siding, boiler rooms, multi-floor commercial and phased work.

How it works in Manhattan

  1. Test and quote

    We sample what your renovation will touch, prepare the ACP-5 for your DOB permit, and give you a clear written quote.

  2. Building paperwork

    COI, scope and schedule to your managing agent; filings and notices when the job is an asbestos project.

  3. Abatement

    Licensed crew, sealed containment and independent air monitoring, during your building’s work hours.

  4. Clearance and closeout

    Clearance air testing, then the closeout documents for your building and your contractor.

Common questions

Do you work with co-op boards and managing agents?

All the time. We provide the COI, scope of work and schedule they ask for, follow the alteration agreement and building work hours, and send closeout paperwork when the job is done.

Do I need an ACP-5 for my renovation?

Most DOB alteration permits in New York City need an asbestos investigation first. If the inspector finds no asbestos in the work area, the ACP-5 says so. If asbestos is found, it has to be removed before the related work starts, and we guide you through that.

Can my neighbors stay home while you work?

Yes. The work area is sealed and kept under negative air pressure, and an independent air monitor checks the air during the job and at clearance.

Is the black mastic under my parquet asbestos?

Often, in prewar and postwar Manhattan buildings. Only a lab test can confirm it. If it is, we remove it before your new floor goes down.

How long does a typical apartment job take?

It depends on the scope and the building’s rules. A single room is usually quick; a full apartment floor takes longer. We give you a schedule with your quote and plan around your contractor.

Do you handle lead paint and mold in Manhattan too?

Yes. We do XRF lead testing for Local Law 31, lead violation removal for HPD and DOH, and mold inspections and remediation.

Tell us what you’re dealing with.

One call or a quick online request gets you a clear quote, or a free in-person estimate when the job needs one. We serve New York and New Jersey alike.

Call NY(347) 394-4411Call NJ(908) 271-8485Get a quotetakes a minute